The exterior of the building has been insulated and rough-ins are nearing completion! Trades have been battling the heat to ensure inspection milestones are met.

Standard Glass is onsite, making great progress on storefront curtain wall and clerestory window frames in the shop area.

Grey Interiors has completed exterior insulation, allowing all exterior metal scans to be completed. Metal panels are now in production.

Spiral ductwork is going up in the shop and will make its way into the parts area.

DPS Electric and Artesian Plumbing are finishing rough-ins in the sales/showroom areas.

The entrance to the shop is looking a little bit different! The high-speed overhead door was delivered and installed in under a week.

Upcoming Construction

  • Frame hard ceilings
  • Overhead and in-wall inspections
  • Shop area rough-ins
  • Spiral duct in parts area
  • Sprinkler riser install
  • Rooftop unit deliveries