Construction Update 6/19/2020

June 23rd, 2020 by

Baker Collection Construction Update 6/19/2020 Finishes continue at Baker Collection, check out our tile install below! Electrical devices and lighting are being installed while glazing continued on the interior and exterior of the sales building. Carwash equipment was installed in the service building this week as the photobooth drywall finishes out. Sales Building Tile flooring…

Posted in New Construction

Construction Update 6/5/2020

June 9th, 2020 by

Baker Collection Construction Update 6/5/2020 Next up: Power! Prior power inspection passed this week to enable final connections be made to the transformer to turn permanent power on to the buildings. Interior storefront install began in the Sales building while sitework continued outside. The Service building Photobooth has been framed and is ready for drywall….

Posted in New Construction

Construction Update 5/29/2020

June 9th, 2020 by

Baker Collection Construction Update 5/29/2020 Curb and landscape island concrete placement began on site this week as ABC stone placement began in the remaining parking area. Exterior glazing install continues on the sales building with showroom ceiling grid installing inside. Site feeders have been run between the sales and service building and from the transformer…

Posted in New Construction

Construction Update 5/23/2020

May 28th, 2020 by

Baker Collection Construction Update 5/23/2020 Exterior glazing began this week at the sales building as DEFS on the covered canopy and metal metal install progressed around the exterior. The sales building also began receiving paint and continued ceiling grid install. Overhead doors were installed on the service building. Mechanical, Plumbing, and Electrical progressed across both…

Posted in New Construction

Construction Update 5/13/2020

May 19th, 2020 by

Baker Collection Construction Update 5/13/2020 A busy week on site means lots of progress! Curtainwall install began on the Sales building bringing us one step closer to building dry in. EIFS application continued as the DEFS application and exposed steel painting kicked off. In the Service building, mechanical and electrical drove onward. Exhaust fans and…

Posted in New Construction

Construction Update 5/4/2020

May 5th, 2020 by

Baker Collection Collection Update 5/4/2020 The sales building has been waterproofed and EFIS installation began. Hanging drywall has begun on the interior with finishing to follow this week. The remaining concrete was poured for the sales building as rough-ins were inspected. Framing in the service building continued and CMU was completed. Sales Building CSW, Inc…

Posted in New Construction

Construction Update 4/3/2020

April 7th, 2020 by

Baker Collection Collection Update 4/3/2020 Sales building steel erection has completed and framing is underway. Ductwork has begun and we now look for roofing and rough-ins to begin. Service building erection continues as wall panels are installed and roofing begins. Sales Building  Steel and roof decking has completed for the sales building. This allowed for…

Posted in New Construction

Construction Update 3/12/2020

March 18th, 2020 by

Steel arrived on site this week for the Sales building and did not miss a beat to begin erecting. The service building slab has been poured and will soon have the metal pre-engineered building erection begin. Conduit for service building power has been run and our front parking lot is set for paving this week….

Posted in New Construction

Construction Update 3/2/2020

March 4th, 2020 by

Construction continues! The install of the new sanitary line is complete and concrete has been poured for the sales building slab. Site lighting conduit is nearing completion and pole bases are being set. Sales Building A big thank you to Caliber Associates for their commitment to getting this slab poured.   Service Building Service building…

Posted in New Construction

New Construction Update 2/10/20

February 10th, 2020 by

With demolition complete, stormwater piping has been installed, and building column lines surveyed and laid out. Sales building footings have been excavated, rebar placed and footing concrete poured. Plumbing and electrical underground rough-ins continue on both the sales and service buildings. Service Building Column lines for the service building have been laid out across the…

Posted in New Construction
Saved
Saved Vehicles ×

SAVED VEHICLES

You don't have any saved vehicles!

Look for this link on your favorites:

Save

Once you've saved some vehicles, you can view them here at any time.

Contact
Contact Us ×

(910) 777-7732

Call Now

4920 New Centre Dr • Wilmington, NC 28405

Get Directions

Today's Hours:

Open Today! Sales: 9am-7pm

Open Today! Service: 7am-6pm

Open Today! Parts: 7am-6pm

Porsche Wilmington

4920 New Centre Dr Wilmington, NC

Phone:

https://goo.gl/maps/W4EmDuCzTJ92

Sales

Phone: (910) 777-7732

4920 New Centre Dr Wilmington, NC
34.24196 -77.879812
Porsche Wilmington 34.24196, -77.879812.